Together with his brother Florian, Peter Klöckner founded an iron and steel trading company in Duisburg, which later became Klöckner & Co.
The company E. Looser & Co. was founded by Emil and Elsa Looser in Vilters. It was not long before the two founders had 25 employees.
Production of the first heavy oil burners in Vilters. The products were also exported to Belgium and Sweden.
During the Second World War, there was a general lack of heating oil. This led to a low demand for burners. Production was quickly converted to the manufacture of hot-air heaters and woodworking machines. After the war, the production of oil burners was resumed.
Klöckner & Co. is entering the heating oil business.
The burners in the engine room of the Gorch Fock are serviced by Klöckner service technicians. Five VW Beetles (radio-controlled cars) are used as service vehicles.
VW panel vans are used by Klöckner for construction and installation crews.
Emil Looser & Co. establishes ELCO representations in Germany with offices in Munich, Frankfurt, Stuttgart, Hamburg, Düsseldorf and Essen.
Klöckner & Co. is changing its name to Klöckner Wärmetechnik. The company is now authorised to use the VHF harbour radio network in the greater Hamburg area. This means that its services now cover an even larger area.
Production and sale of the first oil burners under licence from Oertli.
Production of the first gas blower burners by the Swiss company ELCO in the expanded plant in Ravensburg, Germany.
Oertli's licence is expiring and will not be renewed. Klöckner is now building its own burners.
Klöckner is one of Europe's leading companies for heating and combustion systems.
We are celebrating the 50th anniversary of ELCO Switzerland.
Always at the forefront of new ideas: Klöckner is even working on the latest innovations with corporate giants such as VW.
Swiss company ELCO Energiesysteme AG is taking over the heating technology division from Klöckner.
The merger of ELCO Energiesysteme GmbH and Klöckner Wärmetechnik GmbH in Germany has given birth to ELCO Klöckner Heiztechnik GmbH. At the same time, we are celebrating the opening of the new ELCO research, development and training centre in Hechingen.
Takeover of the Rendamax Group.
Purchase of the Swiss ELCO Energiesysteme AG by the German Preussag AG, one of the largest conglomerates in Germany. ELCO Klöckner Heiztechnik GmbH retains its identity.
The 50,000th end customer signs an ELCO maintenance contract.
Takeover of the entire ELCO Group by the Ariston Group.
ELCO Klöckner is becoming ELCO heating solutions. The new brand name is being presented for the first time at the ISH in Frankfurt am Main.
ELCO is opening its own heat pump production facility in Switzerland.
AURON vacuum collectors supply the Olympic Village in Beijing with solar heat.
Three important anniversaries are being celebrated: 60 years of ELCO service in Germany, 50 years at the Hechingen site and 10 years as part of the Ariston Group.
70 years of ELCO first-class service in Germany, Switzerland and Austria, and 20 years as part of the Ariston Group.